Contact
Site map
KMG logo
АО НК "КАЗМУНАЙГАЗ"
Production performance

Oil and gas condensate 1,96 million tons
Gas 0,43 billion cubic meters
January
  • 1957
  • 432
Oil (million tons) Gas (million cubic meters)
Oil 4,93 million tons (land)
0,46 million tons (sea)
Gas 9,75 billion cubic meters
January
  • 4927
  • 455
  • 9747
Oil transportation (thousand tons (land)) Oil transportation (thousand tons(sea)) Gas transportation (thousand tons)
Refining (consolidate) 1 146 thousand tons
AR 283 thousand tons
PKOP 162 thousand tons
KazMunayGas International N.V. 381 thousand tons
PPCP 320 thousand tons
January
  • 283
  • 162
  • 381
  • 320
AR (thousand tons) PKOP (thousand tons) KazMunayGas International N.V. (thousand tons) PPCP (thousand tons)
ai80 89 tg.  
ai93 118 tg.  
ai95 138 tg.  
ai98 146 tg.  
dt 99 tg.  
(January of 2016)

Oil refining and marketing

Construction of the Aromatics Production Center in Atyrau Refinery

Aim of the project: Establishment of the first petrochemical plant in the Republic of Kazakhstan.

Project description overview:

o manufacturing products with high added value – benzene and paraxylene.

o Production of K3 class motor fuels in accordance with the requirements of technical specifications of the Customs Union. Reduction of the negative environmental impact due to elimination of pollutants emissions into the atmosphere.

Project design passport:

  • Customer – “Atyrau Refinery” LLP.
  • Sector of economy – petrochemistry.
  • Place of project implementation – Atyrau.
  • Term for the project implementation – 2010 – 2015.
  • Cost of the project – 1040 mln.$.(ЕРС-contract)
  • Produced goods: benzene – 133 kt/year, paraxylene – 496 kt/year.
  • Project capacity: 1 000 000 tons/year on raw materials.
  • Number of work places: during construction – up to 3500 people, during operation – 277 people.
  • Project financing scheme: Own and borrowed funds

Current state:

On the first launch facility: construction and installation works have been completed.

Pre-commissioning activities are under completion. The first trial batch of reformate with octane level of more than 100 points has been produced.

On the second launch facility: construction and installation works are under completion. Pre-commissioning activities have been started.

The estimated date of putting APC facilities into operation is 3rd quarter of 2015.


Construction of Advanced oil processing center in Atyrau Refinery

Aim of the project:

  • Expansion of the secondary processes and oil refining efficiency.
  • Production of motor fuels of K4, K5 classes in accordance with the requirements of technical specifications of the Customs Union.
  • Plant efficiency increase up to 5,5 mln. tons per year.

Project design passport:

  • Customer: “Atyrau Refinery” LLP.
  • Sector of economy: oil refinery.
  • Place of project implementation – territory of “Atyrau Refinery” LLP in Atyrau.
  • Term for the project implementation: 2012 – 2016.
  • Cost of the project: 1 680 mln.$ (ЕРС – contract)
  • Produced goods: motor gasoline –1400 kt/year, jet fuel – 244,0 kt/year, diesel fuel –1400 kt/year.
  • Project capacity – 2 388 000 tons/year
  • Number of work places: during construction – 3879 people, during operation – 490 people.
  • Project financing scheme: own and borrowed funds.

Current state: Detailed documentation development is under completion. Construction and installation works are being conducted on 52 construction sites: works on pile setting, sites planning, foundation establishment and equipment installation are being conducted.

Placement of orders for large-sized equipment production, equipment delivery and installation.


Pavlodar Petrochemical Plant modernization

Aim of the project: production of motor fuels of K-4 emission standard meeting the requirements of technical specification of the Customs Union.

Project design passport:

  • Customer – “Pavlodar Petrochemical Plant” LLP.
  • Sector of economy – oil refining.
  • Place of project implementation – Pavlodar.
  • Term for the project implementation – 2011 – 2016.
  • Cost of the project –697 mln. USD (ЕРС–contract).
  • Produced goods: motor gasoline – 1 500 kt/year; aviation fuel – 266 kt/year, diesel fuel – 1 500 kt/year.
  • Project capacity: 5 100 000 tons/year.
  • Number of work places:
  • During operation – 200 people.
  • During construction - 2000 people.
  • Project financing scheme: Borrowed funds.


Reconstruction and modernization of “Shymkent Refinery”

Aim of the project:

  • Plant project capacity recovery up to 6,0 mln. tons of oil per year;
  • Increase of processing depth.
  • Production of motor fuels of K4, K5 classes in accordance with the requirements of technical specifications of the Customs Union.

Project description overview:

Increase of light oil production;

Project design passport:

  • Customer – “PetroKazakhstan Oil Products” LLP.
  • Sector of economy – oil refining.
  • Place of project implementation – Shymkent.
  • Term for the project implementation – 2011 – 2016.
  • Cost of the project – 1 830 mln. $.
  • Produced goods: motor gasoline - 2 200 kilotons per year, aviation fuel - 400 kilotons per year, diesel fuel - 2 000 kilotons per year.
  • Project capacity: 6 000 000 tons/year on raw materials.
  • Project financing scheme: borrowed funds


“Road bitumen production in Aktau plastics plant”

Aim of the project:

  • Establishment of new industrial processes for manufacturing road bitumen from the crude oil of Karazhanbas field.
  • Meeting demands of the road-transport sector of the Republic of Kazakhstan.

Project description overview:

 Production of high quality road bitumen from Kazakhstan oil in the amount of not less than 400 kilotons per year.

Project design passport:

  • Customer: “CASPI BITUM” JV LLP.
  • Sector of economy: oil and gas.
  • Place of project implementation: Mangistau region, Aktau.
  • Terms for the project implementation: 2010–2013.
  • Cost of the project: 290,0 mln.$.
  • Produced goods: road bitumen.
  • Project capacity: 406,0 kilotons per year on production.
  • Number of work places: during operation – 286 people.

Current state:

December 12, 2013 – commissioning in accordance with Aktau State Acceptance Commission

April 9, 2014 – Almaty Branch of the National Center for Expertise and Certification JSC issued Certificate of Conformity for the products under No. KZ.7500317.01.0118928

In connection with the introduction of the standard of the Republic of Kazakhstan for petroleum asphalt ST RK 1373 – 2013 with improved quality indicators since July 1, 2014, Bitumen Plant upgraded to the production of BND 70/100 and BND 100/130 bitumen.

On August 29, 2014, according to new established standards for road bitumen, “National Center for Expertise and Certification” JSC of Almaty issued Certificate of Conformity under No. KZ.7500317.01.01.19245.

In 2014, the plant refined over 400 kilotons of oil and produced over 121 kilotons of road bitumen for the period from March to September. The main share of supply accounts for the Western regions of the country. Aktau bitumen is supplied also for “West China – West Europe” international highway construction.

Currently, liquid bitumen shipment is carried out by railcars (80%) for the distant consumers and by transit bitumen carriers – for the needs of Mangistau region and surrounding areas (20 %).


  • Ақорда ресми сайты
  • Cuba
  • Cuba
  • Cuba
  • Cuba
  • Cuba
  • Cuba
  • ban6
  • privatization.sk.kz
  • ban6
  • ban6
  • ban6
© АО Национальная компания «КазМунайГаз», 2014